Your Local GC Inc
My Deck Was Built Without a Permit and I Received a Notice. What Happens Next?

My Deck Was Built Without a Permit and I Received a Notice. What Happens Next?

Your Local GC Inc•

If you receive a notice about a deck built without a permit, read the notice first, confirm the jurisdiction and response deadline, and gather the property's permit history, survey, plans, photos, and construction details. Do not remove, alter, or cover work merely to make it harder to inspect. The building or code official must determine what documentation and corrective steps are required.

This guide addresses the process after a notice. It does not promise that an existing deck can remain or that an after-the-fact permit will be approved.

Start with the exact notice and property jurisdiction

An Osprey mailing address does not by itself tell you whether a property is inside a municipality or unincorporated Sarasota County. The notice should identify the issuing authority, alleged violation, case or permit number, contact, deadline, and possible hearing information.

For unincorporated county properties, Sarasota County's Code Enforcement Citizen Guide explains that a Notice of Violation identifies the alleged issue and steps or time for compliance. The county emphasizes voluntary compliance, but unresolved matters can move to formal proceedings. Follow the instructions on the notice rather than relying on a general article.

Gather records before deciding whether to repair or remove anything

Useful records include:

  • The notice and every attachment
  • The current property survey and parcel information
  • Existing permit and inspection records
  • Drawings, contracts, receipts, and material information
  • Photos showing the deck, house connection, stairs, guards, footings, and property lines
  • Dimensions and distances to the house, fence, apparent boundary, easements, and other structures
  • Any HOA or deed-restriction documents

Sarasota County provides a public permit search for county records. Older work may have incomplete online information, so ask the issuing office how to request the record that applies to your property.

What must be evaluated before an after-the-fact application?

A qualified contractor or design professional may need to determine whether the existing deck can be documented and brought into compliance. Questions can include:

  • Was it built with adequate foundations, connections, stairs, guards, and load capacity?
  • Can concealed work be verified, or will selective exposure be required?
  • Does its location comply with zoning setbacks, easements, drainage, and environmental restrictions?
  • Are plans, engineering, a survey, or product approvals required?
  • Does any part need correction, partial rebuilding, or removal before inspection?

The official decides what evidence is acceptable. Approval is not automatic merely because a contractor prepares drawings.

Permit fees, penalties, and construction costs are different

Owners often hear several numbers and assume they are one charge. Ask for a written breakdown:

  1. Application, plan-review, and permit fees charged by the jurisdiction
  2. Any citation, penalty, hearing, lien, or enforcement charge tied to the case
  3. Survey, engineering, plan, or professional-service costs
  4. Contractor costs for investigation, exposure, correction, rebuilding, or removal
  5. Reinspection or other charges if applicable

Do not reuse a fee, multiplier, or penalty mentioned in an older conversation. Current charges depend on the case and the official fee schedule. Sarasota County's online permitting portal can be used to apply, pay, and track relevant records, while the contact listed on the notice is the best source for case-specific instructions.

Who pays each amount and when can an inspection be requested?

The property owner, contractor, or another party may pay different items depending on the agreement and official account. Before paying, ask:

  • Who is the payee?
  • What permit, case, invoice, or scope does the payment cover?
  • Is it refundable, creditable, or nonrefundable?
  • Does payment resolve only a fee, or also authorize work?
  • What documents must be accepted before an inspection can be scheduled?
  • Who is responsible for requesting and attending each inspection?

Keep receipts and written approvals. A payment alone does not prove the structure passed inspection or that a violation is closed.

Can the deck stay in place?

Possibly, but only after the authority and qualified professionals evaluate the structure and site. Potential outcomes include documentation and approval, corrective work, partial modification, rebuilding, or removal. If the deck may conflict with a property line or setback, see the companion guide on whether a deck can be modified instead of removed.

Sarasota-area next step

For a property in unincorporated Sarasota County, the county's building, zoning, and code-enforcement teams—not the City of Sarasota—control the county process. A licensed contractor can help document the structure and prepare a corrective scope after the official requirements are known. Homeowners seeking general contractors sarasota fl should still verify license status, insurance, and the exact jurisdiction before signing a repair agreement.

Frequently asked questions

Is an after-the-fact permit guaranteed?

No. The reviewing authority may require plans, engineering, exposure of concealed work, corrections, or removal, and the outcome depends on the property and structure.

Does paying a penalty legalize the deck?

No. A citation or penalty is separate from permit approval, required corrections, inspections, and case closure.

Should I ignore the notice while getting estimates?

No. Contact the issuing office before the response deadline, even if you are still gathering records or contractor proposals.

Call NowFree Estimate